November 19, 2026
Ivins ended October with about twice as many homes for sale as it had a year earlier. Its next wave of new neighborhoods is easy to see from Snow Canyon Parkway and Old Highway 91, but most of that wave is still graded desert, storm drains and underground utilities. That timing gap shapes a buyer's winter. The leverage a buyer has today comes from existing homes. The new projects will compete with those homes later, and the City of Ivins has already set the kind of ownership each new neighborhood is built for.
In October 2026, Ivins had 151 active listings, up from 72 in October 2025. In May, the count was 93. Only 13 homes closed in Ivins that month, compared with a typical month of about 20, and the median sale price was $810,000. Eleven of the 13 closed below list price, and on average sellers received 96.9% of their asking price. Homes that were priced right still sold fast. Median days on market fell to 26 in October from 39 a year earlier.
Washington County as a whole shows the same pattern on a larger scale. According to the Utah Realtors October 2026 market update for Washington County, the county had 2,297 homes for sale in October, up 5.9% from October 2025. That equals 6.0 months of supply, compared with 5.7 a year earlier. In the same month, pending sales fell 19.3% to 306 and new listings fell 15.6% to 558. Homes took a median 82 days to sell, up from 69, and sellers received 94.8% of their original list price. The county's October median sale price was $526,950, down 2.4% from a year earlier.
Fewer new listings and fewer pending sales mean the inventory already on the market is the inventory a buyer can negotiate with this winter. Most of the new competition for those homes is still underground.
Every month, Ivins City's engineering staff reports to the City Council on developer projects the city supervises. The October 2026 engineering report, signed October 9, is the clearest public view of what will be finished in what order. The percentages track civil work such as roads, utilities and grading, not finished homes.
| Project | Civil work status, October 2026 | Location |
|---|---|---|
| Black Desert Resort North Village; Golf Village Phases 1–3 | 100% | Black Desert Resort |
| Black Desert Resort Family Village | 95%, punch list | Black Desert Resort |
| Arava Phase 2 | 90%, punch list | Near 150 North and 500 East |
| Kwavasa Phase 3 | 60%, underground utilities and surface | Near Kwavasa Drive and Kaleva Trail |
| Aventura | 40%, underground utilities | Near 800 South Main Street |
| Chinle Cliffs | 30%, underground utilities | Kwavasa Drive, 400 West, Juniper Way, Guy Lane area |
| Mojave Village | 10%, mass grading and storm drain | Guy Lane and Fitness Way |
| Solterra Phase 1 | Pre-construction meeting held; developer expected to start grading in November | Near 290 South and 100 West |
| Retreat at Snow Canyon | Pre-construction meeting held; report expected mass grading within one to two weeks | Hamblin Parkway and Red Mountain Boulevard area |
The bottom of the table is where most of the future homes are. The engineer described Retreat at Snow Canyon as about 100 acres of "previously undisturbed desert landscape." The plan calls for grading across the whole site, with the wash, the lava formations and parts of the existing ridgelines fenced off. The report calls it "one of the more noticeable development activities taking place in the City." A 2023 concept plan for the site showed 457 homes on 113 acres. They included single-family lots, triplex townhomes, motorcourt flats and elevator flats on both sides of Hamblin Parkway. St. George News reported that Rize Capital is overseeing the development, with Cole West contracted to build the homes.
A project that is just starting mass grading this fall does not compete with this winter's listings. It competes with whatever is still for sale when its first homes are finished.
Over the past year, Ivins approved projects for very different kinds of ownership, from rental townhomes to resort condominiums to custom-home lots. The kind of ownership decides which existing homes each project will compete with.
Aventura is 86 townhomes near 800 South Main Street, 33 larger units and 53 smaller ones. According to its project narrative, the entire project is zoned for short-term rentals. New Wave Construction presented the project to the Ivins Planning Commission in January 2026.
Mojave Village moved the other way. The development agreement for the roughly 64-acre site at Guy Lane and Fitness Way replaces an earlier approval for 160 short-term-rental townhomes. The new plan calls for detached single-family lots, estate lots and attached resort-commercial townhomes. St. George News reported that the City Council voted unanimously on October 15 for Option B, at least 312 units, over a 293-unit alternative. The vote came after at least three meetings. For a buyer, the change is about product. A site once approved for rental townhomes will now add single-family and estate lots to the Guy Lane area.
Black Desert Resort is a third model. The resort sells residences in Resort Center, The Terrace and The Cove, plus 72 custom homesites in Silver Reef. After buying, an owner can join the resort's rental program, enter a separate resort leaseback, or keep the residence for personal use. A January 2024 appraisal described Golf Village as 174 condominium units and Family Village as 285. Golf Village's civil work is now complete and Family Village's is close.
The rest of the pipeline is mostly lots. Solterra Phase 1 is a 70-lot subdivision near 290 South and 100 West. Phase 1 of Chinle Cliffs covers 40 dwelling units on 41.35 acres, developed by Quality Development LLC. Arava Phase 2 finishes its neighborhood with larger minimum lots. Kwavasa Phase 3 is a conventional subdivision with some lots left natural and public streets and paths.
For a buyer, this means the new supply will not compete evenly with existing homes. A resale condo or townhome that can be rented nightly will face Aventura and the Black Desert villages. A single-family resale home near Kwavasa Drive will face Chinle Cliffs, Kwavasa Phase 3 and Mojave Village, three projects within a few blocks of Guy Lane. A home near Red Mountain Boulevard and Hamblin Parkway will face Retreat at Snow Canyon, at whatever pace that project releases homes.
Black Desert's schedule affects when demand arrives as well as when supply does. The PGA Tour's Bank of Utah Championship was played at Black Desert October 1–4, 2026, and its 2027 dates are set for October 7–10. The resort's five-acre water park is planned to open in phases starting in 2027. The 21-court pickleball facility is open. The city engineer reported the water park's civil work at 75% in October. The LPGA's 2027 schedule, announced October 7, 2026, does not include a stop at Black Desert.
For the next year, that means one televised tournament week each October, a water park that opens in stages, and new resort inventory from villages whose infrastructure is already done.
Ivins' October closings were mostly at the top of the market. Eight of the 13 sales were above $700,000, with a median of $1,027,125 for that group. Only five closed under $700,000. In Indigo Trails, two homes sold in October at a median $1,430,000, with a median of 17 days on market. In Black Stone and Red Mountain Estates, one sale each took more than 110 days. The gap between those neighborhoods is about the specific homes, and for now nothing new nearby is competing with them.
That gives a buyer a few practical questions for any Ivins listing this winter. First, which project in the table above is closest to the listing, and what kind of owner is it built for? Second, how long has the listing been on the market, given that Ivins homes sold in a median 26 days in October? Third, would the home still be competitive once nearby lots become finished homes? A seller listing in Ivins now competes with 150 other listings, and a buyer can work with that. Two winters from now, the same seller may also compete with finished homes nearby, and the buyer who purchased this winter could be that seller.
Our Ivins neighborhood page covers the town's main subdivisions. For the side of Ivins that stays the same through all this construction, see what fall in Ivins looks like. If you already own in Ivins and want to see where your home stands against this pipeline, start with a home valuation.
Which Ivins projects are furthest along? In the city's October 2026 engineering report, Black Desert's North Village and Golf Village Phases 1–3 were at 100% civil completion, Family Village was at 95%, and Arava Phase 2 was at 90%.
Where is the most new housing concentrated? Two areas have the most. One is around Guy Lane and Kwavasa Drive, where Chinle Cliffs, Kwavasa Phase 3 and Mojave Village are close together. The other is around Hamblin Parkway and Red Mountain Boulevard, the Retreat at Snow Canyon site.
Is Washington County still a buyer's market? By October 2026 figures, Washington County had 6.0 months of supply, up from 5.7 a year earlier. Homes took longer to sell, and sellers received 94.8% of original list price.
If you're deciding between an Ivins resale home this winter and a new home in one of these projects, The Trainor Team can review a specific address against the city's construction schedule and the listings around it, so you can see what your home will compete with when you sell. Work With Us.
From first conversation to closing, our unwavering commitment is to deliver honest guidance, professional execution, and results that leave every client confident and satisfied.